Panxiu Mountain Tunnel of Changzhi- Linfen Highway

Products

   Panxiu Mountain Tunnel of Changzhi- Linfen Highway 

The geological conditions and surrounding rock quality of this project are poor, with much groundwater and soft rock proportion is up to 72% belongs to Grade 5 surrounding rock. CREG wet shotcrete machine entered the site in April 2016. The spraying volume is more than 2100m3 per month, the total spraying volume has exceeded 20000m³. 