Products
Drilling jumbos are common machineries used in underground mining and construction where mining requires drilling and blasting. They are also used in tunnelling where the solidity of rocks prevents the use of tunnelling equipment. CREG single-boom, double-boom and multi-boom drilling jumbos are specifically designed and developed to meet various construction requirements.
Series
Case Study
Taiyuan-Jiaozuo high-speed railway
The tunnel is single tunnel with double lanes
Length: 8500m
Design speed: 250km/h
Surrounding rock: GradeIII,Grade IV
The surrounding rock is poor and cracked
The single cycle drilling and blasting time is about 2.5 hours, which is stable & fast.
Jinpen Tunnel of Zhengzhou-Wanzhou
High-speed Railway
This three-boom drill jumbo is designed and manufactured with the computer-oriented system, which can optimize drilling parameters according to the geological changes, form geological reports and assist in the establishment of the tunnel big data geological database Moreover, the optimized design of operator cabin and control system improves the comfort of the operator, drilling efficiency and positioning accuracy.
Ganxigou Tunnel of Zhengzhou-Wanzhou
High-speed Railway
Ganxigou Tunnel is located in Fengjie County, Chongqing City. Total length: 11883 meters, dual-line tunnel.
Spanning three nature reserves, two geological parks and one water resources protection area.
Tunnel geology is bedding, bedding bias, rock pile, karst, through sandstone shale, argillaceous sandstone, mudstone limestone and other strata, karst.
Grade V, Grade rv; Grade N: 1353m, 8210m, 2320m
Ganxigou tunnel is constructed by four working faces:
No. 1 adit +No.2 adit + No.3 adit + exit
Xiangluping Tunnel of Zhengzhou-Wanzhou
High-speed Railway
Xiangluping Tunnel of Zhengwan High-speed Railway is located in Shuangyan Village, Gaoqiao Township, Xingshan, Hube1
-Length of the main line: 8734.006m
-Design speed of the main tunnel: 350km/h
-Double-lane tunnel
The level of surrounding rock is mainly Grade IV and V.