Water Tunnel, China

Products

  Irtysh River Diversion Tunnel, China

Water Tunnel


CREG belt conveyor system was successfully applied in a 15.35km tunnel excavated by conventional Drill and Blast method in Irtysh River Diversion Project, Xinjiang, China. This belt conveyor is powered by head and middle drives and equipped with a double tension system. 


Data:


  • Tunnel diameter: 7.08m
  • Excavated material: Soft rock and sand
  • Belt length: 18km
  • Belt width: 800mm
  • Belt strength: ST1600
  • Delivery rate: 630t/h
  • Power installed: 3x315kW+2x300kW
  • Installation: 2017