Products
Irtysh River Diversion Tunnel, China
Water Tunnel
CREG belt conveyor system was successfully applied in a 15.35km tunnel excavated by conventional Drill and Blast method in Irtysh River Diversion Project, Xinjiang, China. This belt conveyor is powered by head and middle drives and equipped with a double tension system.
Data:
- Tunnel diameter: 7.08m
- Excavated material: Soft rock and sand
- Belt length: 18km
- Belt width: 800mm
- Belt strength: ST1600
- Delivery rate: 630t/h
- Power installed: 3x315kW+2x300kW
- Installation: 2017