Products
Water Tunnel
CREG belt conveyor system was successfully applied in a 15.35km tunnel excavated by conventional Drill and Blast method in Irtysh River Diversion Project, Xinjiang, China. This belt conveyor is powered by head and middle drives and equipped with a double tension system.
Data: